APS partnered with a client to support regulatory compliance by developing a reliable system for the extraction and destruction of biogas in accordance with air permit requirements. Our team provided full lifecycle services, including control system design, panel fabrication, PLC/HMI programming, and field commissioning. The enclosed flare control system was engineered to ensure safe, efficient, and consistent operation under varying site conditions. This solution improved system reliability while supporting ongoing environmental compliance.